$280,000 per alley/block

This program is designed to replace an existing deteriorated unimproved alley in a residential neighborhood and will include the necessary sewer structures to alleviate any drainage problems. Due to the variety and shape of alleys throughout the City, actual estimates will vary accordingly.

Notes

  • ADA Ramps will be installed where needed to comply with Federally mandated guidelines.
  • If selected location has existing alley speed humps, they will be replaced as part of this project. New alley speed humps for a concrete alley should be requested separately.
  • Due to engineer design, permit application with OUC review, and construction, these projects can take up to 180 to 210 days to complete.