Residential Street Resurfacing
$54,450 per block
This program is for asphalt resurfacing of residential streets and will consist of three stages: milling, utility adjustments, and final pavement. If the location has existing speed humps, they will be replaced as part of the project. Due to the magnitude of this program, consecutive or adjacent street locations are encouraged to help increase production and minimize costs. Any concrete streets selected for repaving will be charged at a higher rate. Once approved, temporary "no parking" signs will alert residents when their block will be resurfaced. The notices will direct people to relocate their vehicles to adjacent blocks so that the street is entirely free of obstacles for resurfacing to take place.
Notes
- ADA Ramps will be installed where needed to comply with Federally Mandated guidelines
- If you would not like to reinstall any existing speed humps, please indicate that with your street selections.
- Selected locations need to clear CDOT's utility review, alternate locations may be used to avoid conflicts.