Sidewalk Replacement

Sidewalk Replacement

$105,000 per block

This program is designed to replace existing deteriorated sidewalks in residential neighborhoods. Construction will consist of removal, framing, replacement, and restoration. Restoration will consist of topsoil and hydro-seeding the area affected by the construction only. Vaulted sidewalks, sidewalks under railroad viaducts (reference viaduct upgrade), sidewalk through driveway aprons, and sidewalks in commercial areas are more costly. Only deteriorated sidewalk squares will be identified for replacement. Curb attached sidewalks will not be included in this Menu component unless the adjacent curb and gutter is also requested under the Curb and Gutter component of this Menu program.

Notes

  • ADA Ramps will be installed where needed to comply with Federally mandated guidelines or where specifically requested. At corner addresses, the side of the property not on the project street will not be included unless specifically requested.
  • Curb and gutter work is part of another Menu Program component and is not part of the sidewalk program component.